Investment Fields Organized Industrial Zones BERGAMA ORGANİZE SANAYİ BÖLGESİ

BERGAMA ORGANİZE SANAYİ BÖLGESİ

SatartlapGoogle bookmarkDel.icio.usTwitterFacebookMyspace bookmarkDiggJP-Bookmark
bergama-org-san-logo Adres: :Bankalar Cd. No:47/2 35700 Bergama/ İZMİR
Telefon : + 90 232 631 50 05
Faks : + 90 232 632 05 94
Email : This e-mail address is being protected from spambots. You need JavaScript enabled to view it
Web :  www.bosbi.org.tr
ORGANIZATION
24.01.1997 Dated Official Gazette
Ministry Legal Person No:146

ORGANIZATION PURPOSES
To provide the industrialist with land which is approved and allocated for industry and whose infrastructure has been completed
To increase the employment in the region
To develop the region economy
It is located on İzmir-Çanakkale double highway.
It is 10 km away from Bergama, 110 km away from İzmir Alsancak Port, 130 km away from İzmir Airport and 100 km away from Manisa and Balıkesir.
It’s 13 km away from Dikili in which Port and Customs are located.

 

General Information
  •     The total area of Bergama OIZ is 1.747.491 m²
  •     Expropriation procedures have been completed.
  •     In the zone whose planning has been completed, 107 industrial parcels have been created.
  •     Along with the industrial parcels, administrative and social facilities, training facility, technopark, technical service area, sports area and treatment facility have been designed in the planning which has been made.
  •     Planning is rearrangable according to industry sectors to be created.
  •    There is a sufficient amount of  qualified utility water in the zone.
  •    Geothermal energy resources are sufficient in both quality and quantity around the zone.
Advantages
  •     Cheap and qualified work force
  •     Double Highway Transportation Network Richness
  •     45 km to Railway Network(Soma-Aliağa)
  •     Dikili Port where Customs is located
  •     Kuzey Ege (Çandarlı) Container Port Project
  •     Water Reserves in Sufficient Quality and Quantity
  •     Richness of Geothermal Energy Resources
  •     Historic and Cultural Values
  •     Low-slope Land and Low Infrastructure Construction Costs

1/1000, 1/2000, 1/5000 maps of the zone have been made upon the completion of land expropriation and land purchase procedures. Measurement and drawing of the map has been completed and passed the approval and been received. Furthermore, the property project of the zone has been made. 

Geologic and geophysical maps of the zone have been prepared and approved by the General Directorate of Disaster Affairs.
Local Construction Plan of the zone and Construction Plan Statement Report have been completed.

The displacement project of Bergama-Ayvalık energy transfer line passing through the zone have been prepared and approved by TEİAŞ.

Local Construction Plan and Construction Plan statement report have been approved by the Ministry Construction Commission. With the City Administration Committee decision,  they have completed their relevant procedures in the Directorate of Industry City Trade and they have been finalized.

Joint works with DSI for the water needs of the zone have been conducted and water resources have been located. Reserve research contract with DSİ for the water needs have been signed and reserve researches and related reports have been prepared. Project works on a brook improvement with DSI have been concluded.  
Project works on highway regulation with Regional Directorate for Highways and Regional Directorate For Rural Services have been completed.